MV Normand Reach arrived in Killybegs Port August 2014 for Corrib Project Well Head works. MV Normand Reach laid the Umbilical cable from the well head off shore to shore base, on completion of cable laying personnel of MMG Welding Ltd demobilized cable reels, winches, power packs and associated equipment from the back deck of vessel and prepared the deck for seafastening the grillage frames which they have prepared from drawings provided form DOF SUB SEA Design Team. The Grillage is to support the Methanol Tanks on the back deck for to return to the off shore manifold to carry out the cleaning process of the pipeline. All Grillage was demobilized on completion of works allowing MV Normand Reach to return to Norway.